Portions of Policyholder's Expert's Opinions Excluded
November 13, 2023 —
Tred R. Eyerly - Insurance Law HawaiiThe federal district court granted, in part, the insurer's motion to exclude portions of expert testimony. Tundra M. Holdings, LLC v. Markel Ins. Co., 2023 U.S. Dist. LEXIS 139952 (D. Alaska Aug. 10, 2023).
Plaintiff alleged a building it owned suffered damages consisting of building roof failure due to snow load. Plaintiff submitted a claim to Markel for its loss.
Plaintiff hired an engineering firm to conduct an inspection. The recommendation was to install snow guards and that 28 rafters be replaced with new beams. The evaluation did not state that the recommendation was required by law or ordinance. Nor did the evaluation make mention of replacing the metal roof on the building or anything about the water system or sprinkler system. Plaintiff then obtained an estimate of $687,500 for roof repair/replacement, store front repair, a sprinkler system installer and a water system upgrade.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Judgment Proof: Reducing Litigation Exposure with Litigation Risk Insurance
March 04, 2024 —
Latosha M. Ellis & Charlotte Leszinske - Hunton Insurance Recovery BlogIt is not just your imagination: verdicts are getting bigger. So-called “nuclear verdicts” have increased in size and frequency over the past decade, particularly after the COVID-19 pandemic. Litigation risk insurance is a little known, but highly effective, option meant to compliment traditional insurance products and provide additional protection for policyholders nervous about litigation exposure.
Unfortunately, it is difficult to predict the exposure presented by any particular case. Between 2020 and 2022, the median
verdict increased 95%—from $21.5 million to $41.1 million. In
2022, a jury handed down a verdict worth $7.3 billion for injury to a single plaintiff. Even if an injury or loss is minor, juries have shown that they are willing to penalize corporate defendants with punitive damages that significantly exceed the award of compensatory damages. With such uncertainty and millions (if not billions) at stake, companies can reduce risk with litigation risk insurance.
Three key types of litigation risk insurance include: (1) punitive wrap insurance, (2) adverse judgment insurance, and (3) judgment preservation insurance.
Reprinted courtesy of
Latosha M. Ellis, Hunton Andrews Kurth and
Charlotte Leszinske, Hunton Andrews Kurth
Ms. Ellis may be contacted at lellis@HuntonAK.com
Ms. Leszinske may be contacted at cleszinske@HuntonAK.com
Read the full story...
Motion for Reconsideration Challenging Appraisal Determining Cause of Loss Denied
November 16, 2023 —
Tred R. Eyerly - Insurance Law HawaiiThe court rejected the insurer's motion for reconsideration attempting to set aside the appraisal award that determined the cause of loss. Mesco Mfg., LLC v. Motorists Mut. Ins. Co., 2023 WL 5334659 (S.D. Ind. Aug. 18, 2023).
Mesco suffered a loss to the roofs of its facilities due to hail damage. Mesco sued Motorists alleging it breached the policy by failing to pay the full amount of the claim. The claim went to appraisal. The policy's appraisal provision reserved Motorists' right to deny the claim despite an appraisal going forward. The appraisal award noted that the loss was caused by hail.
Cross-motions for summary judgment were filed. The court found that Motorists had breached the policy by failing to pay the arbitration award and granted summary judgment to the insured. The "right to deny" clause did not give Motorists the unfetterd right to disregard the umpire's award if it disgreed about the amount of loss caused by hail. The only dispute was whether the damage was caused by hail, and the umpire found that it was.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Traub Lieberman Partner Michael K. Kiernan and Associate Brandon Christian Obtain Dismissal with Prejudice in Favor of Defendant
November 27, 2023 —
Michael K. Kiernan & Brandon Christian - Traub LiebermanIn a 14-count breach of contract action brought in the Fifteenth Judicial Circuit in Palm Beach County, Florida, Partner Michael K. Kiernan and Associate Brandon Christian obtained dismissal with prejudice in favor of Defendant St. Joseph’s Episcopal Church of Boynton Beach, Florida (“Church”).
Plaintiffs, St. Joseph’s Episcopal School (“School”) and its benefactor, William Swaney, filed suit to enforce an alleged 99-year oral lease agreement which Swaney asserted had been made to him by a prior rector of the Church in exchange for his contributions to the School. Plaintiffs also sought emergency injunctive relief to allow the School to continue to operate on Church property. The Church maintained in part that the only lease in effect was a written lease, approved by the Church Vestry and the Diocese of Southeast Florida, and which the Church Vestry unanimously voted not to renew in 2022.
Reprinted courtesy of
Michael K. Kiernan, Traub Lieberman and
Brandon Christian, Traub Lieberman
Mr. Kiernan may be contacted at mkiernan@tlsslaw.com
Mr. Christian may be contacted at bchristian@tlsslaw.com
Read the full story...
No Damages for Delay May Not Be Enforceable in Virginia
January 08, 2024 —
Christopher G. Hill - Construction Law MusingsAnyone who reads Construction Law Musings with any regularity (thank you by the way) knows that the contract is king in most instances here in Virginia. Any commercial construction subcontractor in Virginia is likely also very familiar with so-called “no damages for delay” clauses in construction contracts. These clauses essentially state that a subcontractor’s only remedy for a delay caused by any factor beyond its control (including the fault of the general contractor), after proper notice to the general contractor, is an extension of time to complete the work. However, in 2015 the Virginia General Assembly passed a change in the law that precluded the diminishment of any right to claims for demonstrated additional costs prior to payment. This left open the question as to which types of “diminishment” would be barred by the statute.
The recent case out of the Eastern District of Virginia federal court, Strata Solar LLC v. Fall Line Construction LLC, added a bit of clarity.
Read the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Construction Litigation Roundup: “This Is Sufficient for Your Purposes …”
April 08, 2024 —
Daniel Lund III - Lexology… but just barely.
Federal courts are “notice” pleading courts. One source writes: “Notice pleading refers to pleading standards that merely notify the opposing party and court of the general issues in the case. In contrast to fact pleading standards, notice pleading standards do not require pleadings to include hyper-detailed facts in support of each claim.”
Some state courts – including Louisiana – are fact pleading courts. Ordinarily, no one practicing in Louisiana state courts would describe the fact pleading requirements for initiating a lawsuit as mandating “hyper-detailing” of the facts, but … why risk it?
In a construction mechanics lien case – the jurisprudence for which requires that courts strictly construe the related law because liens empower lien holders with rights which are “in derogation” of common property ownership rights – the defendant was successful in having the trial court dismiss a lien suit for failing to affirmatively set forth in the complaint (a “petition” in Louisiana) the date of substantial completion. The lien claimant appealed.
Read the full story...Reprinted courtesy of
Daniel Lund III, PhelpsMr. Lund may be contacted at
daniel.lund@phelps.com
Carbon Sequestration Can Combat Global Warming, Sometimes in Unexpected Ways
April 02, 2024 —
Michael S. McDonough, Robert A. James & Amanda G. Halter - Gravel2Gavel Construction & Real Estate Law BlogWhether by land, by sea or through human innovation, carbon sequestration is likely coming to (or already happening in) a destination near you. As our planet, overdosed on greenhouse gases, battles climate disasters, a logical solution is to simply stop pumping carbon dioxide into the air. Legislation worldwide is aimed at that target, but reducing output alone may not be enough. There are still billions of tons of extra CO2 already in the atmosphere—this crossroads is where sequestration comes into play.
Carbon sequestration is exactly what it sounds like—the storage of CO2. Once carbon is sucked out of the air, or in some cases pulled directly from industrial smokestacks, sequestration can be undertaken in a lot of different ways. Carbon storage happens naturally, when forests and oceans absorb and convert CO2 into organic matter, but carbon dioxide can also be artificially injected into deep underground rock formations (or wells), or in some cases technological approaches repurpose carbon into a resource like concrete, or as a catalyst in a closed-loop industrial system. However it’s accomplished, the point of sequestration is to stabilize carbon and ensure it doesn’t creep back into our atmosphere. Researchers, like those at the United Nations’ Intergovernmental Panel on Climate Change, now say that CO2 removal is vital to keeping global warming to 1.5 degrees Celsius (past that threshold, climate change could reach catastrophic levels). A 2023 University of Oxford study estimated that, currently, about two billion metric tons of carbon dioxide are being removed each year, primarily through land management (i.e., planting trees), and suggested that we need to double that amount to avoid dangerous global warming levels.
Reprinted courtesy of
Michael S. McDonough, Pillsbury,
Robert A. James, Pillsbury and
Amanda G. Halter, Pillsbury
Mr. McDonough may be contacted at michael.mcdonough@pillsburylaw.com
Mr. James may be contacted at rob.james@pillsburylaw.com
Ms. Halter may be contacted at amanda.halter@pillsburylaw.com
Read the full story...
Insured Cannot Sue to Challenge Binding Appraisal Decision
December 16, 2023 —
Tred R. Eyerly - Insurance Law HawaiiThe court dismissed the insured condominium association's challenge to an appraisal award. The Courtyards at Prairie Fields Condominium Association v. West Band Mut. Ins. Co., 2023 U.S. Dist. LEXIS 169458 (N. D. Ill. Sept. 22, 2023).
In July 2020, the insured filed a claim with West Bend for damage to the property's roof and other building components as a result of wind and hail. West Bend inspected and estimated the replacement cost for the damage was $60,989.54. This amount was paid to the insured minus the $10,000 deductible. The insured believed the damage was so severe that the roofs need to be replaced, which the insured estimated would cost $1,389,600. The insured demanded an appraisal.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com